Bulk carrier vessel arriving at deep-water terminal with three gantry cranes aligned along the berth and stockpiles fanning out behind
Deep-Water Bulk Terminal · Est. 2008

240,000 DWT.
18,000 TPH.
Your cargo moves.

Coal, grain, iron ore — discharged, stockpiled, and dispatched by multimodal to your inland destination. Every tonne. Every tide.

1,200m
Quay Length
22.5m
Alongside Depth
4.2Mt
Annual Capacity
24/7
Operations
Scroll
Panamax · Capesize · Handymax·ISO 9001:2015 Certified·Coal · Grain · Iron Ore · Fertilizer · Concentrates·Class I Rail Connection·22.5m Alongside Depth·ISPS Compliant·18,000 TPH Peak Discharge·All-Weather Operations·Zero Lost-Time Incidents 2024·Panamax · Capesize · Handymax·ISO 9001:2015 Certified·Coal · Grain · Iron Ore · Fertilizer · Concentrates·Class I Rail Connection·22.5m Alongside Depth·ISPS Compliant·18,000 TPH Peak Discharge·All-Weather Operations·Zero Lost-Time Incidents 2024·
01 — Draught & Berth

Can your current terminal accept a 240,000 DWT Capesize on a single tide without lightening?

Berth Infrastructure

Certified Specifications

ParameterValue
Alongside Depth22.5 m CD
Quay Length1,200 m
Max Vessel LOA340 m
Max DWT240,000 DWT
Max Beam62 m
Max Draught21.0 m
Tidal Range1.8 m
Mooring Dolphins6 per berth
Fender SystemCone type, 2,500 kN
Aerial view of deep-water terminal berths with gantry cranes aligned along the quay wall and bulk carrier vessels moored alongside
↑ Berth 1–3 · 1,200 m Quay
22.5 m CD Depth

Berth Audit Summary

240,000 DWT vessels accommodated without lightening
Three independent berths — simultaneous discharge
Maintained channel depth surveyed quarterly
Pilot boarding ground 12 NM offshore
02 — Discharge Rates

Can your current terminal guarantee 22,000 tonnes per day in monsoon season?

18,000
TPH Peak
5 cranes simultaneous
22,000
t/day guaranteed
Monsoon season
42 hrs
Panamax turnaround
Average 2023–2025
14 km
Conveyor network
Zero dead-end silos

Crane Fleet

5 Mobile Harbour Cranes

UnitModelRate
Grab Crane A–CGottwald HMK 6407 B
65 t grab
3,200 TPH each
Grab Crane D–ELiebherr LHM 800
50 t grab
2,800 TPH each
Continuous UnloaderPneumatic grain
Grain only
1,500 TPH

Throughput Summary

Peak Simultaneous (5 cranes)18,000 TPH
Daily Guaranteed Throughput22,000 t/day
Monsoon Season Performance≥ 85% rated TPH
Mean Turnaround — Panamax42 hrs
Mean Turnaround — Capesize68 hrs
Grab crane unloading bulk coal from a Panamax vessel onto conveyor belts at a deep-water terminal during continuous operations
Grab Crane · 65 t capacity

Discharge Audit Summary

18,000 TPH peak — independently verified by Bureau Veritas
Monsoon season performance ≥ 85% rated capacity
Panamax turnaround: 42 hours average (2023–2025 data)
Conveyor network: 14 km, zero dead-end silos
03 — Storage & Blending

Does your terminal blend to spec, or just pile and hope for the right chemistry at the mill gate?

2.52 Mt
Total Live Storage
±0.5%
Blending Precision
4
Commodity Classes

Storage Inventory

All facilities on-terminal

FacilityCommodityLive Capacity
Open Stockyard A–DCoal / Ore1,800,000 t
Covered Dome Store 1–3Grain / Fertilizer360,000 t
Blending Silo ComplexAll grades120,000 t
Concentrate StoreIron ore / Zinc240,000 t

Storage Audit Summary

2.52 Mt combined live storage — no dead inventory
Blending to customer spec: ±0.5% ash or moisture
Covered grain storage: IP Certification maintained
Automated inventory management — real-time tonnage reporting
Aerial view of bulk commodity stockpiles arranged in rows at a deep-water terminal, showing coal and grain storage areas with stacker-reclaimer equipment
Open Stockyard · 1.8 Mt
Covered dome storage facility for grain and fertilizer at bulk terminal with enclosed conveyor systems and radial stacker equipment
Covered Dome · 360,000 t
04 — Rail & Road Out

When the ship is empty, how fast does your cargo reach the mill — and by which route?

Class I Rail — Direct Connection

Direct interchange with national freight network. Unit train capability.

GaugeStandard (1,435 mm)
Loop tracks4 × 1,200 m sidings
Wagon capacity100 t HAL wagons
Daily loadout48 rakes / day
Inland reach1,400 km network

Truck Loadout — 24/7

Automated truck queuing. RFID gate system. Tare/gross in under 4 minutes.

Loading bays16 simultaneous
Max truck GVM68 t
Throughput3,200 t/hr
WeighbridgeCertified 80 t
Access roadDual carriageway, 4-lane

River Barge — Coastal Feeder

Integrated with terminal conveyor — no double-handling.

Barge berthDedicated 200 m wharf
Max DWT8,000 DWT feeder
Loading rate1,200 TPH
CommoditiesCoal, grain, ore
Coastal reach14 ports served

Multimodal Audit Summary

48 rail rakes per day — unit train capability confirmed
16-bay truck loadout: 4-minute RFID turnaround
Barge feeder to 14 coastal ports — no double-handling
All three modes operate simultaneously without interference

Inland Connectivity

Our terminal sits at the intersection of the national coal corridor, two Class I mainlines, and a navigable river system. No single-mode dependency. No bottleneck when one route is constrained.

Request Capability Statement
05 — Compliance

Can your terminal's environmental record survive a shipper's ESG due-diligence review?

Certifications

All current — no exceptions

ISO 9001:2015Current
Quality Management
Bureau Veritas · 2024–2027
ISO 14001:2015Current
Environmental Management
DNV GL · 2024–2027
ISO 45001:2018Current
Occupational Health & Safety
Lloyd's Register · 2023–2026
ISPS CodeCurrent
Port Facility Security
Port Authority · Continuous
MARPOL Annex VCurrent
Garbage Management Plan
Flag State · Continuous
OHSAS / GHSCurrent
Hazardous Substance Handling
National Authority · 2025–2028

Safety & Environment

Verified performance record

0
Lost-Time Incidents
36 consecutive months · 2023–2025
100%
PPE Compliance
3rd party
Annual audit
24/7
HSE officer on-site

Compliance Audit Summary

Zero Lost-Time Incidents — 36 consecutive months (2023–2025)
Dust suppression: Enclosed conveyors + water cannon on stockyards
Stormwater management: Zero discharge to harbour certified
Annual third-party environmental audit — all findings closed
06 — Partner With Us

You've audited the terminal.
Now let's talk tonnage.

Our commercial team responds within one business day with a tailored terminal services proposal — including berth windows, discharge guarantees, and storage allocation matched to your cargo profile.

Capability Statement Includes

Certified berth specifications and depth surveys
Guaranteed discharge rates by commodity and season
Storage allocation and blending capability matrix
Multimodal connectivity and transit time estimates
Environmental certifications and audit summaries
Commercial rate card (NDA required)

Still Comparing Terminals?

Download the current Berth Allocation Schedule — 90-day forward view of berth availability, maintenance windows, and peak season constraints.

Request Terminal Capability Statement

1.0 Mt
50 kt5 Mt

Commercial terms discussed under NDA. No unsolicited marketing.